Skip to the content

Therma-Chem - Increase Efficiency and Reduce Emissions

Mon - Fri : 9:00 -17:00

[email protected]
Therma-Chem – Boiler Cleaning Expertslogo darklogo light
  • Home
  • About
    • About Us
    • Our History
    • Management Team
    • Global Representatives
  • Application
    • Power Generation
      • Coal
      • Oil
      • Biomass
      • Gas
    • Refineries
      • Boilers
      • CO & Waste Heat Boilers
      • FCC Expanders
      • HRSG
      • CDU VDU
      • Platformers & Reformers
      • Shutdowns Turnarounds
      • Pressurised Units
    • Shipping
      • Marine Boilers
      • Waste Heat Boiler and Economiser
  • Products
    • FS12
    • Turbo-Mor
    • MB9
  • Case Studies
  • Downloads
  • Blog
  • UNFCCC Approved
Contact us
Therma-Chem – Boiler Cleaning Experts
  • Home
  • About
    • About Us
    • Our History
    • Management Team
    • Global Representatives
  • Application
    • Power Generation
      • Coal
      • Oil
      • Biomass
      • Gas
    • Refineries
      • Boilers
      • CO Boilers
      • FCC Expanders
      • HRSG
      • CDU VDU
      • Platformers Reformers
      • Shutdowns Turnarounds
      • Online Cleaning of Pressurised Units
    • Shipping
      • Marine Boilers
      • Waste Heat Boiler & Economisers
  • Products
    • FS12
    • Turbo-Mor
    • MB9
  • Case Studies
  • Downloads
  • Our Blog
  • UNFCCC Approved
  • Contact

Process Heater

Process Heater

Crude Distillation Unit

Problem

Fouled furnace.

After Therma-Chem Treatment

Therma-Chem FS12 cleaned the fouled heater tubes online and maintained the cleanliness throughout the run. IR Scan Images indicate that the tubeskin temperatures for the bottom and mid-section were c.5O°C lower after three months of chemical injection.

The temperatures in the top section of the heater were also lower as indicated by the shift in temperature scale (circled).

Radiant temperature constraint was eliminated and heater duty limitation partly relieved. Furthermore, there were also no plugging issues with the Air Pre-Heater or the ID Fan.

Ultimately, the use of Therma-Chem FS12 resulted in a projected improvement of 0.3 EII points for the refinery.

Date:

05/04/2018

Category:

Singapore

Tags:

Process Heater
Share
Process Heater
Belgium
  • Application
  • Products
  • Downloads
  • UNFCCC Approved
  • ISO 9001
+44 (0) 1698 767 575
[email protected]

World leading experts in the online cleaning of boilers, fired-heaters, and rotating equipment.

Contact us:
[email protected]
+44 (0) 1698 767 575
Our address:
G.B. Therma-Chem Limited.
52 Crossgates, Bellshill, ML4 2EE, Scotland, UK
Our social:
Terms and conditions
Privacy policy
© 2023 G.B. Therma-Chem Ltd. Design by Nexus.

Therma-Chem are world leading experts in the online cleaning of boilers, fired-heaters, and rotating equipment within power plants and refineries.

[email protected]
+44 (0) 1698 767 575