2 x 350 MW (2 Boilers x 1,065 T/hr) firing a mixture of Fuel Gas and Heavy Fuel Oil
Problem
Fouling of superheaters and economisers resulting in efficiency loss.
After Therma-Chem Treatment
A TÜV inspection revealed that hard scale formations on the superheater and stringer tubes were removed by FS12. This resulted in an efficiency increase of 1.1% for the limited duration of the 33-day trial and an emissions reduction of c.40 tonnes of CO2 per day.